AchillesGames

payline – Wiktionary

obscene - Wiktionary

English[edit]

Etymology[edit]

pay +‎ line

Noun[edit]

payline (plural paylines)

  1. (playing) A line of symbols on a slot machine (horizontal, vertical or diagonal) that may win a jackpot.
    • 1994, Victor H. Royer, On line casino Journal’s Play Good and Win, →ISBN:

      Which means to win something, you have to line up a successful mixture on that middle payline and on that line solely.

    • 2012, Avery Cardoza, Profitable On line casino Play, →ISBN, web page 11:

      Very similar to bingo, the a number of payline machines give slots gamers numerous instructions that may flip them right into a winner. The one payline machine has one line throughout the machine, which reveals the place the reels should line up for a successful mixture to be paid. The a number of payline machine, alternatively, has three or 5 traces, relying upon the machine, which give gamers extra successful positions on the reels.

    • 2014, Victor H. Royer, Highly effective Earnings From Slots, →ISBN, web page 42:

      The disadvantages in multi-payline machines are that the smaller payoffs are often very small, a lot smaller than on one-payline machines, and likewise that the highest jackpot is often paid provided that you line up the right successful symbols within the appropriate sequence on the underside, or third, payline. Or the fifth payline in case of the five-line machines, or the eighth payline in case of the eight-line machines, and so forth — principally, in the event you do not play all of the paylines you can not win the jackpotl

  2. A criterion rating utilized by a company that provides grants to find out which functions are adequate to be given cash.
    • 2005, Reif-Lehrer, Grant Software Author’s Handbook, →ISBN, web page 249:

      When an Institute signifies a specific percentile payline, it signifies that Functions with an equal or higher (decrease) percentile will usually be funded.

    • 2013, Robert J. Sternberg, Writing Profitable Grant Proposals from the Prime Down and Backside Up, →ISBN:

      NIH institutes differ within the quantity of discretion exercised across the payline.

    • 2016, Stuart Firestein, Failure: Why Science is So Profitable, web page 189:

      I must be fairly glad. And I’m definitely happier than these whose scores fell under the payline and who won’t get funding. However I wrote a number of proposals to get that one funded, turning the method right into a type of lottery — the extra you play, the butter your possibilities (which is definitely not true; it is simply the one choice).

  3. The minimal wage related to a pay grade.
    • 1969, United States Division of Protection, Modernizing army pay, web page 89:

      A modification, utilizing bigger intergrade differentials between the decrease grades and with differentials steadily lowering in measurement because the payline moved upward by means of larger grades, solved each problems- – offering extra almost aggressive charges at GS-5 and 08-7 and a OS-18 price which was a lot decrease and extra cheap within the Federal context

    • 1973, Federal Pay Comparability Changes–1973:

      This desk additionally compares these payline charges with present Basic Schedule payline charges (as established by Government Order 11637, December 22, 1971), and reveals the will increase wanted at every grade to achieve comparability.

    • 1975, Congressional Serial Set – Quantity 13072, web page 19:

      As proven by the Desk above, the common of the non-public enterprise PATC payline intergrade differential is 18.6%. The applying of that common 18.6% as a relentless differential would supply, after all, a payline actually conforming to the requirement that “pay distinctions be maintained in line with work and efficiency distinctions” inside the labeled service schedule.

  4. (civil engineering) The deliberate restrict of an excavation, past which a contractor shouldn’t be paid for any excavation work.
    • 1971, The Navy Engineer: Journal of the Society of American Navy:

      The specs offered for a round payline 24 ft in diameter — 6 inches past the minimal clearance diameter of 23 ft.

    • 1981, Geological Survey Skilled Paper – Quantity 831, Half 3, web page C-11:

      A contractor is paid for excavating a specific amount of rock when developing a tunnel; the road drawn in a cross part of the tunnel that defines this restrict of excavation is named the payline (fig. 12). Any materials excavated outdoors the payline is outlined as overbreak, and a contractor shouldn’t be paid for excavating that materials.

    • 2004, Fred G. Bell, Engineering Geology and Development, →ISBN, web page 187:

      Nonetheless, breakage hardly ever, if ever, continues past a vertical distance equal to half the width of the tunnel above the highest of a semi-circular payline (Fig. 3.4c).

  5. (bookkeeping) A line in a paysheet, comparable to a single paycheck.
    • 1999, Adam T. Bromwich, Peoplesoft HRMS Reporting, →ISBN:

      The payline quantity (LINE#) represents a single worker on a paysheet. Paylines are created in the course of the paysheet creation course of. One line is ready up per worker, until extra are required.

    • 2003, Jonathan F. Hutchings, Undertaking Scheduling Handbook, →ISBN, web page 114:

      That is true of lump-sum initiatives, however the state of affairs is reversed in unit-price contract initiatives, as a result of a cost-loaded community doesn’t synchronize with the payline gadgets on unit-price contracts.

    • 2006, IT Governance Institute, Safety, Audit and Management Options PeopleSoft, →ISBN:

      Paysheets are composed of paylines, and every payline represents a paycheck.

Related posts

Leave a Comment